Built Around the Kootenay Way Facility


Sun Ridge Environmental was established in 2022 alongside the opening of the corporation’s environmental operation at 1348 Kootenay Way. The facility was developed through 2021 and 2022 to receive and manage soil, water, slurry and other project materials. The division grew from that facility rather than predating it.

Learn About Our Facility
Sun Ridge Environmental Facility at Kootenay Way

Safety, Ownership and Compliance


Sun Ridge Contracting Ltd. first achieved COR certification in 2020. The corporation holds B.C. Licence to Transport Hazardous Waste LT1618 for contaminated soil and maintains regular communication with Tk’emlúps te Secwépemc as a TteS Band Member-owned business.

Practical Environmental Services in the BC Interior

Our work is built around practical project needs: excavation, cleanup, transportation, receiving and material management. Sun Ridge also provides contaminated-site remediation support and coordinates formal laboratory analysis, legal surveying and other professional services through qualified independent providers when required. The goal is straightforward service without overstating in-house professional capabilities.

Products and Services

Have a Project in Mind?

Get in touch with Sun Ridge Environmental to coordinate professional solutions tailored specifically to your site's practical goals.

Contact Us
Sun Ridge environmental containment infrastructure and hydrovac equipment

INTEGRATED CAPABILITIES

Environmental Facility With Field Capability


The Kootenay Way operation combines receiving infrastructure with hydrovac, trucking and heavy-equipment capability. Its 1.6-million-litre containment cell supports qualifying water, slurry and hydrovac material, while field crews provide excavation, cleanup, recovery and transportation services. This lets Sun Ridge support projects from field work through receiving and material management.

Learn More About Our Facility